Dwarf Pole (Underground Connection)

Temporary underground power for sites with an existing Western Power dome. We supply and install the meter, with power live when we leave on the second visit.

Best for: Sites with a dome / underground supply

A dwarf pole is a temporary underground connection for a site that already has a Western Power dome. You hold the Synergy account and give us the reference number. We install the pole on the first visit, then supply and connect the meter on the second visit, so power is on when we leave. It is not an overhead long pole and it is not a pit connection.

Who it is for

Sites with a dome or other underground supply.

What you supply

The Synergy account and the Synergy reference number on our application form.

Not included

We do not open the Synergy account for you. A meter cannot be moved to another property.

Typical situation

A lot in an underground estate where the dome is already on site.

What's included

  • Supply and installation of the meter (temporary or permanent)
  • Pole installation
  • Energised connection - power is on when we leave

Requirements

  • Western Power dome on site
  • Customer-held Synergy account
  • Synergy reference number supplied on the application form

How it works

  1. Customer applies for a Synergy account (online or by phone) and supplies the reference number on our application form
  2. Visit 1: we install the dwarf pole
  3. Visit 2: we supply the meter and complete the connection — power is live on departure

Important notes

  • Temporary meter option (cash / one-off customers): we remove the meter on disconnection and return it to Western Power, which closes the account. No removal charge.
  • Permanent meter option (ongoing customers): the meter stays with the property and is later relocated into the meter box. An additional relocation fee applies.
  • Meters cannot be moved between properties. They must remain with the property until removed or relocated.

What affects the cost

Our charge depends on the connection type, whether the supply is single-phase or three-phase, whether we supply the meter, and whether we have to enter a Western Power pit. Western Power and Synergy set their own connection, metering and account fees. Those fees change, so this site does not quote them. See Western Power’s temporary overhead supply page for their current information. We confirm what is included in our work before you proceed.

Third-party fees were last reviewed on 9 November 2026. The amounts are not copied onto this page.