Best for: Sites where supply comes from a Western Power pit instead of a dome or overhead
A pit connection takes supply from a flat, ground-level Western Power pit, rather than from an overhead line or a dome. Not every electrician is allowed to enter those pits. We are accredited to enter them, and a pit connection can be combined with any of our pole or meter services.
Who it is for
Sites whose supply comes from a Western Power pit instead of a dome or an overhead line.
What you supply
A Western Power pit on site, plus the pole or meter service you are combining with it.
Not included
Pit entry is not free of the extra pit-entry fee. That fee applies each time we enter the pit, including connection and disconnection, except when we are removing a temporary meter at disconnection.
Typical situation
A site with a ground-level tail-strip pit and no dome or overhead point for the temporary supply.
What's included
- Pit entry and energised connection
- Can be combined with any pole or meter service
Requirements
- Western Power pit on site
How it works
- We assess the Western Power pit and perform the energised connection alongside your pole or meter installation
Important notes
- An additional pit-entry fee applies each time we enter the Western Power pit, including both connection and disconnection.
- Exception: when we are removing a temporary meter at disconnection, the additional pit-entry fee does not apply.
What affects the cost
Our charge depends on the connection type, whether the supply is single-phase or three-phase, whether we supply the meter, and whether we have to enter a Western Power pit. Western Power and Synergy set their own connection, metering and account fees. Those fees change, so this site does not quote them. See Western Power’s temporary overhead supply page for their current information. We confirm what is included in our work before you proceed.
Third-party fees were last reviewed on 9 November 2026. The amounts are not copied onto this page.