Long Pole (Overhead Connection)

Temporary overhead power for empty blocks where overhead supply is available. We handle the Synergy account from start to finish.

Best for: New empty sites with overhead supply

A long pole is a temporary overhead connection for an empty block where the supply is overhead and there is no existing meter. We open the temporary Synergy account in our name, install the pole, and arrange the Western Power connection. You pay for the electricity used on site. A dwarf pole is the alternative where the site already has an underground dome.

Who it is for

New empty sites with overhead supply.

What you supply

A completed application, and whether the site needs single-phase or three-phase.

Not included

The Synergy account is not put in your name. Electricity usage is invoiced separately, as set out in the notes below. This is not the service for a site that already has a Western Power dome.

Typical situation

A vacant residential lot with an overhead Western Power line and no meter on the block.

What's included

  • Pole rental for 12 months
  • Western Power connection fee
  • Synergy disconnection fee
  • Ongoing account management

Requirements

  • Empty block with no existing meter
  • Overhead supply available at the site
  • Completed application form
  • Single-phase or three-phase nominated

How it works

  1. We open the temporary Synergy account in our name
  2. We install the long pole and submit tickets for certification
  3. Western Power connects the pole and supplies the meter
  4. Power is live - you pay only for electricity usage

Important notes

  • The account is held in our name so we can later disconnect the supply and recover the pole.
  • Electricity usage is on-invoiced approximately every two months with a 20 percent administrative loading. Invoices are payable within 14 days.

What affects the cost

Our charge depends on the connection type, whether the supply is single-phase or three-phase, whether we supply the meter, and whether we have to enter a Western Power pit. Western Power and Synergy set their own connection, metering and account fees. Those fees change, so this site does not quote them. See Western Power’s temporary overhead supply page for their current information. We confirm what is included in our work before you proceed.

Third-party fees were last reviewed on 9 November 2026. The amounts are not copied onto this page.