End of Run Pole

Pole installed at the end of pre-installed consumer or sub mains. Suited to battleaxe blocks and sites where standard placement is not feasible.

Best for: Battleaxe / rear blocks and restricted-access sites

An end-of-run pole sits at the end of consumer mains run from a dome, or sub mains run from a distribution metering main or permanent pole, to the future meter-box position. It is the usual approach on a battleaxe or rear block, and where walls stop a normal temporary-mains trench. Your electrician runs those mains. We install the pole at the end of them and fit a permanent meter.

Who it is for

Battleaxe blocks, rear blocks, and restricted-access sites.

What you supply

Consumer or sub mains already installed to the future meter-box location.

Not included

We do not install the consumer or sub mains. Disconnection is not a simple meter pull: those mains have to be redirected into the house at the same time, and we cannot leave a disconnected meter on site.

Typical situation

A battleaxe lot where the temporary pole cannot sit at the street frontage.

What's included

  • Pole installation at the end of the customer-supplied consumer or sub mains
  • Permanent meter installation and connection

Requirements

  • Consumer mains installed from a Western Power dome, or sub mains installed from a DMM or permanent pole, to the future meter box location
  • Permanent meter strongly recommended for these connections

How it works

  1. Your electrician installs the consumer or sub mains up to the meter box position
  2. We install the pole at the end of those mains
  3. The permanent meter is fitted and connected

Important notes

  • Disconnection is more involved: the consumer or sub mains must be redirected into the house at the same time the meter is removed. We cannot leave a disconnected meter on site.
  • Best suited to coordinated work with an electrician, particularly DMM-fed sites that can be isolated at the DMM.
  • Cash and one-off customers should understand the meter relocation requirements before proceeding.

What affects the cost

Our charge depends on the connection type, whether the supply is single-phase or three-phase, whether we supply the meter, and whether we have to enter a Western Power pit. Western Power and Synergy set their own connection, metering and account fees. Those fees change, so this site does not quote them. See Western Power’s temporary overhead supply page for their current information. We confirm what is included in our work before you proceed.

Third-party fees were last reviewed on 9 November 2026. The amounts are not copied onto this page.